| |
TM 9-4120-367-14
TM 07592B-14/1
Location/Item
Action
Remarks
Testing
See table 4-3, Step 1.
Installation
a. Install wires.
Terminal Connections
Single-Phase Model F18H
X29B20V
1
X1F20V
2
3-Phase Models F18H-3 and F18H-4
X2J20B
1
X32A20B
2
3-Phase Model MHP-20-4-08
J2B-6<>CB2-1
1 (Line)
J2B-7<>CB2-2
2 (Load)
b. Install circuit breaker in junction box.
Locating dimple provided for
correct installation.
c Thread nut onto circuit breaker shaft.
d. Install junction box.
e. Connect power supply.
5.14 CONTROL CIRCUIT BREAKER CB2. - Continued
Wire No.
Terminal No.
Wire No.
Terminal No.
Wire No.
Terminal No.
5-45
|