| |
TM 9-4120-367-14
TM 07592B-14/1
5.16 CONNECTOR P2. This task covers removal and installation.
INITIAL SETUP
Applicable Configurations:
All
Test Equipment:
Multimeter
Special Tools:
None
Materials/Parts:
Heat-shrink Tubing
Solder
Cleaning Cloths
Hot Air Dryer
Equipment Descriptions:
Power OFF; installed in shelter
Special Environmental Conditions:
None
General Safety Instructions:
See WARNING page
References:
None
Troubleshooting References:
None
Personnel Required:
Refrigeration Specialist
Location/Item
Connector P2
Removal
Action
a.
b.
Disconnect power supply from air conditioner.
Turn connector knob to the left (about five full
turns) until it is free.
Remarks
High voltage can kill.
NOTE
Connector is two gang con-
nector. figures FO-1, FO-3,
FO-5, FO-7 and FO-9 label as
P2A and P2B.
5-50
|