TM 9-4120-367-14
TM 07592B-14/1
5.29 HEATER. - Continued
Location/Item
Action
Remarks
3-Phase Model MHP-20-4-03
- Continued
HR1-1<>TB2-7
HR1-1
7
HR1-2<>TB2-1
HR1-2
1
HR2-1<>TB2-7
HR2-1
7
HR2-2<>TB2-4
HR2-2
4
HR3-1<>TB2-8
HR3-1
8
HR3-2<>TB2-2
HR3-2
2
HR4-1<>TB2-8
HR4-1
8
HR4-2<>TB2-5
HR4-2
5
HR5-1<>TB2-9
HR5-1
9
HR5-2<>TB2-3
HR5-2
3
HR6-1<>TB2-9
HR6-1
9
HR6-2<>TB2-6
HR6-2
6
b. Install one heater at a time and slide bracket down
after each heater is installed.
c. Slip nut lockwasher, and insulating washer over
heater leads before leads are connected to termi-
nal board TB2.
d. Insert heaters in bracket and support.
e. Install and tighten bracket.
f. Replace heater thermostat.
Paragraph 5.28
g. Replace top covers.
h. Install air conditioner.
Installation
Wire No.
Heater
TB2
5-88
|