| |
TM 9-4120-367-14
TM 07592B-14/1
Location/Item
Action
Remarks
Installation
e. Clamp bulb well to coil.
- Continued
f. Install mist eliminator.
Paragraph 5.21
g. Install air outlet louver.
h. Nitrogen purge system.
Paragraph 6.4
i. Leak test and evacuate.
Paragraphs 6.2 and 6.6
j. Charge refrigerant system.
Paragraph 6.8
k. Replace covers.
6-59
6.17 EVAPORATOR COIL. - Continued
|