| |
TM 9-4120-367-14
TM 07592B-14/1
6.25 HIGH AND LOW PRESSURE SWITCHES. - Continued
Location/Item
Action
Remarks
Removal
c. Pull junction box out of frame.
Continued
d. Remove two mounting screws and Iockwashers.
e. Disconnect capillary tube connection.
f. Tag and disconnect electric wires from switch.
g. Pull capillary tube through grommet.
h. Pull switch from air conditioner.
Installation
a. Insert capillary tube through grommet.
b. Connect capillary tube to fitting.
c. Install switches.
d. Secure with two screws and washers.
e. Connect electric wires.
f. Replace drier/filter.
Paragraph 6.15
g. Nitrogen purge system.
Paragraph 6.5
h. Leak test and evacuate.
Paragraphs 6.2 and 6.6
i.
Charge system with liquid refrigerant.
Paragraph 6.8
j.
Replace control panel.
k. Replace covers.
l. Connect electric power.
m. Test air conditioner.
6-88
|