| |
TM 9-4120-367-14
TM 07592B-14/1
7.2 SHIPMENT. This task covers shipment.
INITIAL SETUP
Applicable Configurations:
All
Test Equipment:
None
Special Tools:
None
Materials/Parts:
Packing Materials
Wood for Base
Kraft Paper
Plastic Wrap
Tape
Strapping Material
Equipment Descriptions:
Power OFF; removed from shelter
Special Environmental Conditions:
None
General Safety Instructions:
See WARNING page
References:
None
Troubleshooting References:
None
Personnel Required:
Direct Support
Location/Item
Shipment
Action
Remarks
a. Bolt air conditioner to a heavy wood frame.
2 x 4 or 4 x 4
b. Cover with plastic wrap, kraft paper, etc.
c. Strap covering in place.
d. Mark air conditioner per standard Army proce-
dures.
7-2
|