Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 7.2 SHIPMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  9-4120-367-14 TM 07592B-14/1 7.2 SHIPMENT. This task covers shipment. INITIAL  SETUP Applicable   Configurations: All Test Equipment: None Special  Tools: None Materials/Parts: Packing  Materials Wood for Base Kraft Paper Plastic Wrap Tape Strapping  Material Equipment  Descriptions: Power OFF; removed from shelter Special  Environmental  Conditions: None General Safety Instructions: See WARNING page References: None Troubleshooting   References: None Personnel  Required: Direct  Support Location/Item Shipment Action Remarks a. Bolt air conditioner to a heavy wood frame. 2 x 4 or 4 x 4 b. Cover with plastic wrap, kraft paper, etc. c.  Strap  covering  in  place. d. Mark air conditioner per standard Army proce- dures. 7-2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business