| |
TM 9-4120-367-14
TM 07592B-14/1
Section Il. SERVICE UPON RECEIPT
3.4 UNPACKING. This task covers unpacking and inspection.
INITIAL SETUP
Applicable Configurations:
Special Environmental Conditions:
All
None
Test Equipment:
General Safety Instructions:
None
See WARNING page
Special Tools:
References:
None
None
Materials/Parts:
Troubleshooting References:
None
None
Equipment Descriptions:
Personnel Required:
Assembled; ready for installation
Unit Maintenance (2 reqd.)
Location/Item
Action
Remarks
Container
Air Conditioner
Unpacking
a. Cut steel strapping.
b. Remove plastic wrap.
c. Lay unit on side with help of assistant.
d. Remove four mounting bolts.
Keep bolts for permanent
mounting.
Inspection
a. Inspect the equipment for damage incurred dur-
ing shipment. If the equipment has been dam-
aged, report the damage on DD Form 6, Packag-
ing Improvement Report.
b. Check the equipment against the packing slip to
see if the shipment is complete. Report all dis-
crepancies in accordance with the instructions of
DA Pam 738-750.
c. Check to see whether the equipment has been
modified.
d. Report any modifications.
3-2
|