Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION OR REMOVAL. - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   9-4120-367-14 TM  07592B-14/1 Location/Item Cheok  Power Supply -  Continued Action Power supply circuit breaker must be OFF. Installation must be checked prior to turning ON power. b. a. b. a. b. c. d. e. f. Connect mating power supply connector to J1 or J11. Check installation. Perform steps in paragraph 3.6 before placing unit in operation. Remove power at Main Circuit Breaker. Disconnect power cable at air conditioner. Remove insulating material from area around air conditioner. Connect sling to lifting handles (4). Position hoist (wrecker) next to shelter in order to lift air conditioner. Connect sling to two handles (one either side) on condenser  section. The maintenance personnel MUST be visible to hoist or wrecker operator and in a position to guide air conditioner away from shelter. Remarks Unit ready for operation Checkout.  Paragraph  3.6. High voltage can kill. Air conditioner weighs 256  pounds  (116.1  kg). 3-17 3.5   INSTALLATION   OR   REMOVAL.   -   Continued Installation Check R e m o v al

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business