Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 3. 6 PRELIMINARY SERVICING AND ADJUSTMENT OF EQUIPMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4120-367-14 TM 07592B-14/1 3.  6 PRELIMINARY  SERVICING  AND  ADJUSTMENT  OF  EQUIPMENT.  This  task  covers  rechecking  the  instal- lation and operationion of unit. INITIAL  SETUP Applicable     Configurations: Test Equipment: NONE Special Tcols: None Materisls/Parts: None PersonnelRequired: Unit   Mantenace Special  Environmetal    Coditions: NOSE General Safty Instructions: See WARNING PAGE References: None Troubleshooting   References: None Location/Item Shelter Air  Conditioner Action a. b. c. d. e. f. g. Check that fabric cover is rolled up end secure. check that airflow to and from condenser is free of anything that will block airflow. Keep ALL sources of heat et least 10 feet (30.4 m) from condenser coil. Keep ALL sources of dangerous or objectionable fumes at least 10 feet (30.4 m) from fresh air in- take. Check electrical connections. See Chapter 2, Sections I and Ill. Operate Unit (1) Cool, high and low (2) Heat, high and low (3) Vent, high and low (4) Fresh air open Remarks Automobile or truck exhaust, refuse  container  fuel  con- tainers, etc. 3-19

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business