Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 4-50. RELAY SOCKETS.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-000- CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 4-50. RELAY SOCKETS. This task consists of:  Inspection Removal Installation INITIAL SETUP: Tools Tool kit, service, refrigeration unit (Item 1, Appendix B) Personnel: 1 Equipment Conditions: WARNING Disconnect input power to the air conditioner before performing any internal maintenance.  Voltages used can KILL.  Shutting the unit off at the control panel does not disconnect unit power. 1. Disconnect air conditioner input power at source. 2. Swing open control box, left and right electric plates (para 4-45). INSPECTION/TEST 1. Pull relay from socket (para 4-49 or 4-54). 2. Check that relay socket and terminals are not cracked, broken, loose, or corroded (see Figure 4-53). 3. Use multimeter to measure resistance from each socket contact to its associated terminal (see Figure FO-3). Resistance should be 0.5 ohm or less.  Replace socket, if defective. REMOVAL 1. Remove relay from socket (para 4-49 or 4-54). 2. Tag and disconnect leads. 3. For K7, K18 or K19 socket removal, remove control box brace (para 4-63). 4. Remove suppression diode (para 4-47). 5. For K1-K7, K18-K20, remove two screws (1), locknuts (4), flat washers (5), clip (2), and socket (3). 6. Remove resistor (para 4-55). 7. For K21 or K22, remove two screws (6), clips (9), locknuts (8), and four flat washers (10) and socket (7). INSTALLATION 1. Install K21 or K22 socket (7) with two screws (6), clips (9), four flat washers (10), and two locknuts (8). 2. Install resistor (para 4-55). 3. Install K1-K7, K18-K20 socket (3) with two screws (1), flat washers (5), clip (2), and two locknuts (4). 4. Install suppression diode (para 4-47). 5. Plug relay into socket (para 4-49 or 4-54). 6. If sockets K7, K18 or K19 were replaced, install control box brace (para 4-63) as required. 7. Reconnect leads and remove tags. 4-93

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business