Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 4-53. HEATER CONTRACTOR (K11).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-000- CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 4-53. HEATER CONTRACTOR (K11). This task consists of: Inspection Testing Removal Installation INITIAL SETUP: Tools Tool kit, service, refrigeration unit (Item 1, Appendix B) Personnel: 1 Materials: Varnish, moisture and fungus resistant (Item 16, Appendix E) Equipment Conditions: WARNING Disconnect input power to the air conditioner before performing any internal maintenance.  Voltages used can KILL.  Shutting the unit off at the control panel does not disconnect unit power. 1. Disconnect air conditioner input power at source. 2. Remove center front evaporator panel (para 4-22). 3. Open left electric-plate (para 4-30). INSPECTION Inspect contactor for cracks, corrosion, loose electrical connections, and loose mounting hardware.  Replace contactor if cracked, broken, or badly corroded (see Figure 4-56). TESTING Using multimeter, measure continuity across contactor coil with one wire disconnected from coil terminal.  If meter does not read 60 ±  10 ohms, replace contactor. REMOVAL 1. Tag and disconnect leads. 2. Remove three screws (1), locknuts (3), and six flat washers (2). 3. Remove contactor and mounting plate (4). INSTALLATION 1. Fungus proof replacement heater contactor per MIL-V-173. 2. Place contactor and mounting plate (4) in mounting position. 3. Install three screws (1), locknuts (3), and six flat washers (2). 4. Reconnect leads and remove tags. FOLLOW ON PROCEDURE 1. Close right electric plate (para 4-31). 2. Close left electric plate (para 4-30). 3. Install center front evaporator panel (para 4-22). 4. Install right front evaporator panel (para 4-25). 5. Connect air conditioner input power at source. 4-100

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business