Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-000-CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 INSTALLATION 1. Place clamp (11) on heater element (10). 2. Place element (10) and clamp (11) in mounting position. 3. Install screw (14), lockwasher (13), and flat washer (12). CAUTION Use two wrenches to ensure that terminal stud does not turn, preventing ceramic breakage. 4. Install two nuts (8). 5. Reconnect wire leads tagged in removal onto terminal stud (9) 6. Install four flat washers (7), lockwashers (6), and locknut (5). 7. Place plastic cover (4) in mounting position. 8. Install three screws (3), lockwashers (2), and flat washers (1). FOLLOW ON PROCEDURES 1. Install left front evaporator panel (para 4-23). 2. Connect air conditioner power at source. 4-157

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business