| |
ARMY TM 9-4120-381-14
NAVY EE-000-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
Para
Title
Page
5-45
Tubing and Fittings ................................ ................................ ................................ ....
5-100
5-46
Compressor ................................ ................................ ................................ ..............
5-101
5-47
Valve Plate Assembly ................................ ................................ ...............................
5-109
5-48
Pump End Bearing Assembly ................................ ................................ ....................
5-111
5-49
Crankshaft, Pistons and Rods ................................ ................................ ...................
5-113
5-50
Electrical Box Assembly ................................ ................................ ............................
5-118
5-51
Terminal Plate ................................ ................................ ................................ ...........
5-120
5-52
Current Overloads (K23 and K24) ................................ ................................ .............
5-123
5-53
Condenser Coil ................................ ................................ ................................ .........
5-125
5-54
Evaporator Coil ................................ ................................ ................................ .........
5-127
5-6.
GENERAL. This section contains maintenance procedures which are authorized to Direct Support Maintenance
(F) by the Maintenance Allocation Chart (MAC) Appendix B and Source, Maintenance and Recoverability (SMR) coded
items. Each paragraph covers a complete maintenance procedure but may require other tasks to be included (i.e. initial
setups, references and follow on procedures). Perform procedures/tasks in designated order.
5-7.
PANELS AND INFORMATION PLATES. For removal, inspection, cleaning, and installation, refer to the
following paragraphs:
a.
Center Front Evaporator Panel. Refer to paragraph 4-22.
b.
Left Front Evaporator Panel. Refer to paragraph 4-23.
c.
Right Front Evaporator Panel. Refer to paragraph 4-25.
d.
Information Plates. Refer to paragraph 4-26.
e.
Left Front Condenser Panel. Refer to paragraph 4-27.
f.
Right Front Condenser Panel. Refer to paragraph 4-28.
g.
Front Service Valve Panel. Refer to paragraph 4-29.
h.
Left Electric Plate. Refer to paragraph 4-30.
i.
Right Electric Plate. Refer to paragraph 4-31.
j.
Repair. Repairs are limited to straightening of minor dents, rewelding of broken welds, installation of loose or
missing rivets and rivnuts, replacement of quarter turn receptacles, replacement of loose or missing bushing,
grommets, gaskets and insulation, paint touch up, and replacement of damaged or missing information plates.
(1)
Minor Dents. Repair minor dents using standard sheet metal repair practices.
(2)
Broken Welds. Repair broken welds using standard weld repair practices.
(3)
Rivets. To replace loose or missing rivets, drill old rivet out using a drill bit slightly smaller than the
diameter of old rivet body, and install replacement rivet.
(4)
Rivnuts. To replace loose or missing rivnuts, drill old rivnut out using a drill bit slightly smaller than the
diameter of the old rivnut body, and install replacement rivnut.
(5)
Quarter Turn Receptacles. To replace or repair quarter turn receptacles, drill old rivet out using a drill bit
slightly smaller than the diameter of old rivet body, and install replacement receptacle.
5-9
|