Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 5-11. Start Up After Repairs
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-000-CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 5-22. START UP AFTER REPAIRS - Continued. FOLLOW ON PROCEDURE WARNING Personnel injury and/or equipment damage may result if compressor is started when service valves are not in a backseated (counterclockwise) position. 1. Connect air conditioner input power at source. 2. Check supply of refrigerant in system (para 5-17). 3. Install right front evaporator panel (para 4-25). 4. Install right front condenser panel (para 4-28). 5. Return air conditioner to normal operation. Figure 5-11.  Start Up After Repairs 5-44

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business