Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TESTING/ADJUSTMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-000-CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 TESTING/ADJUSTMENT 1. Using multimeter, check continuity between two lead terminals.  If continuity is indicated (switch closed), switch is defective.  Replace switch. 2. Connect manifold blue hose to nitrogen cylinder. 3. Connect yellow 1/4 inch (0.64 cm) hose to pressure line (4). 4. Using multimeter, switch should close at 4 to 6 psig (0.29 to 0.43 kg/cm2) and open at 9 to 12 psig (0.65 to 0.86 kg/ cm2) 5. If switch can not be adjusted to ranges in step 4, replace switch. INSTALLATION 1. Place switch (10) in mounting position. 2. Install two screws (8), four flat washers (9) and (11), and two locknuts (12). 3. Install five clamp (5) with five screws (2), ten flat washers (3) and (6), and five locknuts (7). 4. Install pressure lines (4) to rear of compressor (5/8" wrench). 5. Reconnect leads tagged in removal and remove tags. 6. Install cover (1). 7. Leak test all newly connected joints and those in the repair area (para 5-15). FOLLOW ON PROCEDURE 1. Connect air conditioner input power at source. 2. Check refrigerant level (para 5-17) and charge if necessary. 3. Install right front condenser panel (para 4-28). 5-53

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business