| |
ARMY TM 9-4210-381-14
NAVY EE-000-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
Table 2-1. Operator Preventive Maintenance Checks and Services - Continued
Item
Inter-
Items to
Not Fully Mission
No.
Val
Check/
Procedure
Capable If:
Service
3
Before
Control
a.
Check for obvious damage and missing parts.
Control panel
Panel
damaged.
During
b.
Check for proper operation.
Unit not operating
properly.
4
After
Air
Check for obstructions, damage, and loose or
Obstructions,
Conditioner
missing hardware
damage, loose or
missing hardware.
Section III. OPERATION UNDER USUAL CONDITIONS
2-4.
GENERAL. The following section covers initial setup procedures and the modes of operation for the air
conditioner.
2-5.
ASSEMBLY AND PREPARATION FOR USE. Contact unit maintenance personnel for original unpacking,
installation,
and preparation for use.
2-6.
INITIAL ADJUSTMENTS AND CHECKS. Inspect panels for loose mounting or shipping damage. Report
any deficiencies to unit maintenance.
2-5
|