Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FOLLOW ON PROCEDURE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-00-CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 5-46.  COMPRESSOR - Continued. BURN OUT PROCEDURE - Continued. 19. Install new drier filter (para 5-26) and clean refrigerant strainer cartridge (para 5-27). 20. Backseat (counterclockwise) compressor discharge valve (para 5-33) and suction valve (para 5-34). 21. Disconnect external power source from L1 and L2 coils (para 4-88) and reconnect wire leads. 22. Close manual valve (para 5-39). 23. Evacuate refrigerant system (para 5-' 6). 24. Charge refrigerant system (para 5-17). 25. Allow the air conditioner to run for 48 hours, check color and odor of oil, if oil is still discolored or has an acid odor perform the following: a. Drain compressor oil. b. Repeat steps 19, 23, 24, and 25 until the oil remains clean, odor free and oil color approaches that of new oil. FOLLOW ON PROCEDURE 1. Connect air conditioner input power at source. 2. Charge refrigerant system (para 5-17). 5-108

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business