| |
ARMY TM 9-4120-381-14
NAVY EE-000-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
c.
Install Right Front Condenser Panel. Install panel (1) and tighten eight captive fasteners (2). Ensure inspection/
service door (3) is closed (see Figure 4-20).
Figure 4-20. Right Front Condenser Panel Installation
d. Install Right Front Evaporator Panel. Install panel (2) and tighten six captive fasteners (1) (see Figure 4-21).
Figure 4-21. Right Front Evaporator Panel Installation
e. Install Left Front Condenser Panel. Install panel (1) and tighten six captive fasteners (2) (see Figure 4-22).
Figure 4-22. Left Front Condenser Panel Installation
4-13
|