| |
ARMY TM 9-4120-381-14
NAVY EE-000-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
Figure 4-26. Center Front Evaporator Panel
WARNING
Acetone and Methyl-Ethyl Ketone (MEK) are flammable and their vapors can
be explosive. Repeated or prolonged skin contact or inhalation of vapors
can be toxic. Use a well ventilated area, wear gloves, and keep away from
sparks or flame.
c.
Clean area for new gasket, using acetone or MEK and a stiff brush.
d.
Coat surfaces of metal and gasket with adhesive. Let both surfaces dry until adhesive is tacky but will not stick
to fingers.
e.
Starting with an end, carefully attach gasket to metal surface. Press into firm contact all over.
f.
Install captive fasteners.
2.
Insulation.
a.
Cut and remove damaged section of insulation (5).
b.
Clean area for new insulation, using acetone or MEK and a stiff brush.
c.
Cut replacement insulation to fit.
d.
Coat surfaces of metal and insulation with adhesive. Let both surfaces dry until adhesive is tacky but will not
stick to fingers.
e.
Starting with an end, carefully attach insulation to metal surface. Press into firm contact all over.
f.
If insulation retainer (4) is removed, install new retainer (4) with rivet (6).
3.
Captive Fasteners.
a.
Remove split ring retainer (7), fastener (10), themoplastic wear washer (8), and ejector spring (9).
b.
Install ejector spring (9), thermoplastic wear washer (8), fastener (10), and split ring retainer (7).
INSTALLATION
1.
Position panel (2) in place.
2.
Tighten eight captive fasteners (1).
FOLLOW ON PROCEDURE
Connect air conditioner input power at source.
4-37
|