Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: a. Removal
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4120-389-14 a. Removal (1) Remove six screws and lockwashers that secure the junction box to casing. (2) Pull junction box from unit until far enough to access TB1 and E5. (3) See wiring diagram (FO-1), tag and remove leads as follows: (a) J3-A, J3-B and J3-C from TB1 and E3 from ground E5. (b) All leads from terminals on TB2, terminals 3 and 4 excepted. (c) Leads from terminals 1 through 9 on TB4. (d) Leads from terminals 1, 2 and 3 of TB5. (e) Separate six push-on leads from evaporator blower motor B3. (4) Pull junction box from unit. b. Repair.  Repair by component replacement. c. Installation (1) Push junction box in unit far enough to allow installation of leads. (2) See tags and wiring diagram (FO-1) and connect leads removed in step a.(3) above. (3) Align two pins in casing with two mating holes in junction box. (4) Push junction box to engage with casing. (5) Secure junction box to casing with six screws and lockwashers. Follow-on procedures: 1. Install top cover (See para. 4-14). 2. Install control module. (See para. 4-38). 4-144

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business