| |
TM 9-4120-389-14
c. Installation
(1) Thread leads J3-A, J3-B, J3-C and E5 into grommet.
(2) Push leads through grommet hole in bulkhead.
(3) Install sleeve on leads E5, J3-A, J3-B and J3-C.
(4) Align four mounting holes in casing with four holes in gasket.
(5) Secure cover, connector J3 and gasket to casing with four screws, lockwashers and nuts.
(6) Bundle leads and secure with cable ties.
(7) Install grommet in bulkhead.
(8) Apply sealant (Item I, Appendix E) at grommet/bulkhead interface and leads/grommet interface.
Follow-on procedures: 1. Install top cover (See para. 4-14).
2. Install junction box (See para. 4-46).
4-173
|