Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 5-20. PRESSURE SNITCHES (S4 AND S5)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4120-389-14 5-20.  PRESSURE SNITCHES (S4 AND S5) Preliminary procedure:  Remove top cover (See para.  4-14). a. Test (1) Press and release reset button to be sure that switch is not tripped. (2) Tag and disconnect leads on pressure switch. (3) Using multimeter set on lowest OHMS scale, check for continuity between terminals 1 and 2 on pressure switch (S4 or S5).  Be sure reset is pressed in. (4) If there is no continuity, replace pressure switch. b. Removal WARNING All  refrigerant  -22  must  be  discharged  from  system  before  attempting  to  remove pressure switches (S4 and S5). (1) Tag and remove jumper lead between S4 and S5. (2) Discharge the refrigeration system (See para.  5-3). (3) Restrain tube and fitting. (4) Loosen flare nut. (5) Remove screw and lock nut from clamp that secures capillary tubing. (6) Remove clamp. (7) Remove two screws and lockwashers from switch.  (S4 or S5). (8) Remove pressure switch (S4 or S5). c. Installation (S4 or S5) (1) Coil capillary tube of replacement pressure switch. (2) Install pressure switch on bracket using two screws and lockwashers. (3) Restrain tube and fitting. (4) Tighten flare nut on fitting. 5-50

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business