| |
TM 9-4120-389-14
(5)
Install clamp on capillary tubes.
(6)
Install clamp on casing with screw and lock nut.
(7)
See tags and wiring diagram (FO-1) and connect wire leads. Remove tags.
(8)
Replace dehydrator (See para. 5-10).
(9)
Leak check the flare nut connection (See para. 5- 6).
(10)
Evacuate the system (See para. 5-7).
(11)
Charge the system (See para. 5-8).
Follow-on procedure: Install top cover (See para. 4-14).
5-52
|