TM 9-4120-389-14
(7)
Evacuate the system (See para. 5-7).
(8)
Charge the system
(See para. 5-8).
(9)
Install screw, lockwasher and nut in clamp.
(10)
Install nut and lockwasher in stud of accumulator.
(11)
Install insulation or accumulator and tubing.
Follow-on procedure: Install top cover (See para. 4-14).
5-78
|