Remove all blocking and tiedowns that may have been used to secure the container to the carrier.
2
Use a forklift truck, overhead hoist, wrecker, or other suitable material handling equipment to
remove the packaged unit from the carrier.
UNPACKING
1
General. Normally, the air conditioner should be moved into the immediate area in which it is to
be installed before it is unpacked.
NOTE
The shipping container and pallet are of such a design that they may be retained for reuse
for mobility purposes if frequent relocation of the air conditioner is anticipated.
2
Remove Shipping Container. Remove all bands and retaining devices that secure the upper
container to the base pallet. Lift the container vertically and remove it from the base pallet.
3
Remove Packaging. Remove the cushioning around the top of the cabinet and retain, if reuse is
anticipated. Remove the preservation barrier, if applicable, by tearing around the bottom of the
air conditioner cabinet. Remove the technical publications envelope and accessory sack that are
taped to the cabinet, and put them in a safe place.
NOTE
It is recommended that the cabinet be left bolted to the shipping pallet until time to place
it in the installation position. All receiving inspection actions can be conducted without
removal from the pallet.