Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-4120-423-14&P
4
Using screwdriver, tag and disconnect terminal board leads from heaters and wiring harness.
5
Disconnect six terminal connecting links.
6
Using screwdriver, remove two screws that hold terminal board.
7
Remove the terminal board and marker strip.
8
If the terminal board support is to be removed, see WP0014 and separate the evaporator and
condenser section assemblies.
9
Using screwdriver and wrench remove the four screws and locknuts and remove the terminal
board support.
INSTALLATION
NOTE
If the terminal board support was not removed, skip steps 1 and 2
1
Using screwdriver and wrench, install the terminal board support with four screws and locknuts.
2
See WP0014 and reconnect the evaporator and condenser section assemblies.
3
Using screwdriver, install the terminal board and marker strip with two screws.
4
Connect the six terminal connecting links.
5
See tags and wiring diagram, and connect the leads from the heaters and wiring harness.
Remove the tags.
6
Secure thermostatic switch bracket to evaporator section back wall with four screws, four
locknuts and eight spacers.
7
Place thermostatic switches on protruding screw threads and secure each switch with two flat
washers, lockwashers, and locknuts.
8
See tags and wiring diagram and connect leads. Remove the tags.
9
Install top evaporator cover (See WP0026).
10
Install the fan and motor assembly (See WP0030).
11
Connect power.
0020 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business