Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
1
Tag leads.
2
Using cross tip screwdriver, remove screws holding leads to relay socket terminals.
3
Remove relay from socket.
4
While holding each screw from the underside, remove two lockwashers and nuts to remove relay
socket. Remove screws.
5
Repeat above process to remove two remaining relays and relay sockets.
INSTALLATION
1
Place relay socket in box and align holes.
2
Using cross tip screwdriver, secure each relay socket to box with two screws, lockwashers and
nuts.
3
Plug relay into socket.
4
Match leads to relay socket terminals using tags, wire marking and wiring diagram.
5
Using cross-tip screwdriver, secure leads to relay socket terminals.
6
Remove tags.
7
Place cover on box and line up holes.
8
Using screwdriver, attach the cover with six screws and lockwashers. Do not over tighten, it will
cause distortion. See WP0041.
9
Install evaporator section electrical module assembly. See WP0032.
10
Install top evaporator cover. See WP0026.
0038 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business