Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-4120-423-14&P
3
Soften and remove old adhesive and gasket residue, using dry cleaning solvent and a stiff brush.
4
Use only approved replacement material as specified in Chapter 8.
5
EMI gasket material specified for this unit is supplied with adhesive backing.
6
Cut gasket to size. Be sure that EMI gasket corners are installed so that good continuous edge
contact is made.
7
Be sure that surface to which gasket is to be applied is clean and free of paint and old adhesive
material.
8
Remove backing material from adhesive side and immediately press gasket in place. Be sure
that good edge-to-edge contact is made on the EMI gaskets.
INSTALLATION
1
Place cover on box and line up holes.
2
Using screwdriver, attach the cover with six screws and lockwashers. Do not over tighten, it will
cause distortion.
3
Install evaporator section electrical module assembly. See WP0032.
4
Install evaporator top cover. See WP0026.
END OF TASK
0041 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business