|
|
TM9 4120-423-14&P
3
Shake out excess water prior to installation.
REPAIR OR REPLACEMENT
1
Repairs are limited to replacement of distributor, rivets, plate nuts, and the straightening of
mashed fins.
2
Plate nuts may be removed by drilling out the old rivets using a drill bit slightly smaller than the
diameter of the rivet.
3
Install new plate nut(s) and rivets.
4
If fins are mashed or dented so that the airflow across the coil would be blocked, straighten them
using a plastic fin comb.
5
Using wrench, carefully disconnect the low and high condenser to evaporator Refrigerant R-22
metal hose line connectors from the coupling halves. See WP0091.
INSTALLATION
1
Tubing should be nitrogen purged during all brazing/debrazing operations.
2
Clean and prepare distributor, tubing and elbow prior to installing new expansion valve. (See
3
Slip expansion valve in place in original position and check that fittings and tubing fit properly
into expansion valve solder cups.
4
Wrap wet rags around expansion valve body and distributor tubes.
5
Using torch, braze the three expansion valve joints in accordance with WP0072.
6
Slip the sensing bulb into its mounting bulb straps. Be sure the bulb is on top of the suction line
in original position and tighten the two nuts and screws. Be sure the sensing bulb is making
good metal-to-metal contact with the suction line.
7
Replace the insulation tape that was removed from the sensing bulb and expansion valve
connections. Use insulation tape, applied in spiral with overlapping edges.
WARNING
When handling coils, wear gloves to avoid cuts and reduce fin damage on the coil.
0078 00-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |