|
|
TM9-4120-423-14&P
2
Replace rubber mounts that are under the compressor feet, one at a time.
3
Tilt compressor high enough to slide rubber mount out from under foot.
NOTE
The smaller diameter necked portion of the rubber mount goes toward compressor foot.
4
With the smaller diameter (necked portion) of the rubber mount up, slide the mount back under
the compressor foot. The necked portion should fit into hole in compressor foot.
5
Repeat steps (3) and (4) above on remaining three rubber mounts if they are to be replaced.
6
Place four top mounting sleeves necked portion down into holes in compressor feet.
7
Using socket, extension, and ratchet, secure the compressor with four cap screws, lockwashers,
and flat washers.
8
To obtain proper loading, tighten cap screw until contact is made with all parts. Then turn cap
screw head 2-1/2 to 3-1/2 more turns.
9
Install left end condenser cover. (See WP0045).
10
Install top condenser cover. (See WP0044).
11
Install air conditioner on shelter (See WP0006).
END OF TASK
0096 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |