Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-428-14
0033 00
Replace the Compressor circuit breaker (12) if defective.
INSTALLATION
1. Insert circuit breaker toggles through the control panel. Be sure the OFF position matches lettering on the panel.
2. Secure circuit breaker (12) to panel with screws (10) and flat washers (11).
3. Insert pin (8) and spacers (9) through circuit breaker toggles and lock them together.
4. See tags and wiring diagram (Fig. 4-4) and connect the wire leads. Remove tags.
5. Check that the grommets (14) are secure in the shaft holes.
6. Slip the back mounting plate (7) in place and align holes with three spacer posts (6). Check that the grommets (14) are
still in place in the shaft holes. Secure with three self-locking screws (5).
7. Install the knob (4) and tighten the setscrew (3).
8. Slip the control cover (2) in place and secure with four machine screws (1).
NOTE
FOLLOW-ON MAINTENANCE:
Install control module (WP 0029 00)
END OF WORK PACKAGE
0033 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business