|
|
TM 9-4120-428-14
0068 00
2
5
POINT 4
3B
AREA
6
3A
POINT 1
1
4
2
REMOVED
REMOVED
FROM SYSTEM
FROM
18
SYSTEM
POINT 2
POINT POINT
POINT 5
3
6
11
11
14
SUCTION
DISCHARGE
LINE
LINE
SERVICE
SERVICE
16
12
10
7
VALVE
VALVE
BYPASS
SOLENOID
VALVE
15
8
PRESSURE
17
13
EQUALIZER
SOLENOID VALVE
P
P
9
AREA
FIND
QTY
NOMENCLATURE
NO.
COMPRESSOR, RECIPROCATING
1
1
HOSE ASSEMBLY, METAL
2
2
COIL,CONDENSER WITH ANGLE
1
3A
SUB COOLER
1
3B
RECEIVER, LIQUID REFRIGERANT
1
4
INDICATOR, SIGHT, LIQUID
1
5
DEHYDRATOR, DESICCANT, REFRIGERANT
1
6
SOLENOID VALVE WITH LEADS
1
7
VALVE, EXPANSION (PRIMARY)
1
8
COIL, EVAPORATOR
1
9
REGULATOR, FLUID PRESSURE
1
10
VALVE, SERVICE
2
11
VALVE, PRESSURE RELIEF
1
12
SWITCH, PRESSURE (HIGH)
1
13
CYLINDER ASSEMBLY, ACTUATING, LINEAR
1
14
SOLENOID VALVE WITH LEADS
1
15
VALVE,EXPANSION (QUENCH)
1
16
SWITCH, PRESSURE (LOW)
1
17
HOSE ASSEMBLY, METAL
1
18
11. Close the auction line service valve and move the discharge line from the valve at point 3 to the tubing at point 2.
12. Start the pump and flush the line for approximately 10 minutes and then turn the pump off.
13. De-energize the bypass solenoid valve by disconnecting the dc voltage source from pins A and B of plug P8.
14. Start the pump and flush the line for approximately 10 minutes and then turn the pump off.
0068 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |