Click here to make tpub.com your Home Page

Page Title: Purging
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-428-14
0068 00
Purging - Continued
11. Remove the nitrogen line from the tubing at point 5 and connect it to the tubing at point 4. Release nitrogen into the
system for approximately 5 minutes or until moisture ceases to be discharged from the system.
12. Remove the nitrogen line from the tubing at point 4 and connect it to the valve at point 6. Release nitrogen into the
system for approximately 5 minutes or until moisture ceases to be discharged from the system.
13. Remove the nitrogen line from the valve at point 6 and connect it to the valve at point 3. Release nitrogen into the
system for approximately 5 minutes or until moisture ceases to be discharged from the system.
14. Remove the nitrogen line from the valve at point 3.
15. Close the suction line and the discharge line service valves.
16. Cap all open tubing until the installation of new components.
17. Reconnect plugs P8 and P9 to receptacles J8 and J9 respectively.
NOTE
FOLLOW-ON MAINTENANCE:
Install compressor (WP 0090 00)
END OF WORK PACKAGE
0068 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business