|
|
DRAFT
TB 9-2320-279-13-1
FIELD LEVEL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) -
Continued
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Field Level Preventive Maintenance Checks and Services (Semi-Annual)
Location
Item
Not Fully Mission
Interval
Item to
Procedure
No.
Capable if:
Check/Service
HEMAC085
WARNING
Ensure engine is cool before performing
maintenance. Failure to comply may result
in severe burns.
NOTE
Ensure operator/crew has performed Operator's
PMCS listed in Chapter 2 of this technical
bulletin, before continuing.
(a) Engine cover opened and engine side panel
1
Semi-
AC System
removed (TM 9-2320-279-10).
Annual
(Engine
Compartment)
(b) Check AC condenser (1) and AC
compressor (2) for damage and missing or
loose mounting hardware.
(c) Check two AC compressor drive belts (3) for
damage and proper tension. Belt tension gage
reading should be 90-100 lbs. (400-445 N).
If gage reading is not correct, adjust drive belt
tension (WP 0022).
0008-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |