Click here to make tpub.com your Home Page

Page Title: FOLLOW-ON MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

DRAFT
TB 9-2320-279-13-1
AC CONDENSER REPLACEMENT - Continued
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
HEMAC055
NOTE
Ensure preformed packings are in place in hoses prior to installation.
3. Install preformed packing (7) and hose (6) on fitting (8). Torque hose (6) to 11-13 ft-lbs. (15-18 Nm).
4. Install preformed packing (4) and hose (3) on fitting (5). Torque hose (3) to 15-18 ft-lbs. (20-24 Nm).
5. Connect connector (1) to connector (2).
FOLLOW-ON MAINTENANCE
1. Connect batteries (TM 9-2320-279-20).
2. Charge AC system (WP 0050).
3. Perform leak test inspection (WP 0049).
END OF WORK PACKAGE
0028-5/(0028-6 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business