|
|
DRAFT
TB 9-2320-364-13&P-1
FIELD LEVEL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) -
Continued
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Field Level Preventive Maintenance Checks and Services (Semi-Annual)
Location
Item
Not Fully Mission
Interval
Item to
Procedure
No.
Capable if:
Check/Service
PLSAC114
WARNING
Ensure engine is cool before performing
maintenance. Failure to comply may result
in severe burns.
NOTE
Ensure operator/crew has performed Operator's
PMCS listed in Chapter 2 of this technical
bulletin, before continuing.
1
Semi-
AC System
(a) Left side noise panel and rubber flap removed
Annual
(Engine
Compartment)
(b) Check AC condenser (1) and AC
compressor (2) for damage and missing or
loose mounting hardware.
(c) Check two AC compressor drive belts (3) for
damage and proper tension. Belt tension gage
reading should be 90-100 lbs. (400-445 N).
If gage reading is not correct, adjust drive belt
tension (WP 0020).
0008-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |