|
|
DRAFT
TB 9-2320-364-13&P-1
AC DEFROST CABLE REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Materials/Parts
Field Level Maintenance
Tie, Cable (Item 13, Appendix E)
Equipment Condition
Personnel Required
Electronic control box (EBC) cover removed
One
(TM 9-2320-364-20).
References
Heater compartment access panel removed
TM 9-2320-364-20
(TM 9-2320-364-20).
Tools and Special Tools
Tool Kit, General Mechanic's (Item 9, Appendix F)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |