|
|
DRAFT
TB 9-2320-364-13&P-1
AC EVAPORATOR CORE AND EXPANSION VALVE REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Materials/Parts
Field Level Maintenance
Adhesive, 3M # 1300 (Item 1, Appendix E)
Oil, PAG 46V (Item 3, Appendix E)
Equipment Condition
Foam Tape (Item 15, Figure 5, Appendix G)
AC heater/evaporator removed (WP 0037).
Lockwashers (9) (Item 4, Figure 5, Appendix G)
Preformed Packing (Item 9, Figure 7,
Tools and Special Tools
Shop Equipment, Common No. 1 (Item 5,
Preformed Packing (Item 7, Figure 7,
Shop Equipment, Common No. 2 (Item 6,
Preformed Packings (2) (Item 17, Figure 5,
Tool Kit, General Mechanic's (Item 9, Appendix F)
Lockwashers (2) (Item 19, Figure 5, Appendix G)
Personnel Required
MOS 52C, Utilities equipment repairer
References
TM 9-2320-364-20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |