|
|
DRAFT
TB 9-2320-364-13&P-1
AC EVAPORATOR CORE AND EXPANSION VALVE REPLACEMENT - Continued
INSTALLATION
PLSAC013
NOTE
Install bracket as noted prior to removal.
1. Install bracket (29) on expansion valve (20) with two lockwashers (28) and screws (27).
NOTE
Lightly lubricate preformed packings with PAG oil prior to installation.
Ensure preformed packings are on fittings prior to installation.
2. Install preformed packing (26) and fitting (25) on expansion valve (20).
3. Install preformed packing (24) and fitting (23) on expansion valve (20).
PLSAC012
4. Install preformed packing (22) and fitting (21) on expansion valve (20). Torque fitting (21) to 18-22 ft-lbs.
(24-30 Nm).
0030-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |