|
|
DRAFT
TB 9-2320-364-13&P-1
AC HEATER CORE REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Materials/Parts
Field Level Maintenance
Lockwashers (5) (Item 4, Figure 5, Appendix G)
Equipment Condition
Personnel Required
AC heater/evaporator removed (WP 0037).
MOS 52C, Utilities equipment repairer
Tools and Special Tools
References
Tool Kit, General Mechanic's (Item 9, Appendix F)
TM 9-2320-364-20
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |