|
|
DRAFT
TB 9-2320-364-13&P-1
AC HEATER/EVAPORATOR REPLACEMENT - Continued
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PLSAC142
15. Install AC cable (22) on damper control arm (23) with speed nut (21).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PLSAC141
16. Install ground wire (19) on heater/evaporator (20) with washer (18), lockwasher (17), and screw (16).
17. Plug optic ribbon (14) into light source (15).
0037-14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |