|
|
DRAFT
TB 9-2320-364-13&P-1
AC HIGH PRESSURE SWITCH REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Materials/Parts
Field Level Maintenance
Oil, PAG 46V (Item 3, Appendix E)
Tags, Identification (Item 10, Appendix E)
Equipment Condition
Tie, Cable (Item 13, Appendix E)
Left side noise panel and rubber flap removed
Preformed Packing (Item 16, Figure 4,
Batteries disconnected (TM 9-2320-364-20).
Personnel Required
Tools and Special Tools
One
Shop Equipment, Common No. 1 (Item 5,
References
Shop Equipment, Common No. 2 (Item 6,
TM 9-2320-364-20
Tool Kit, Electrical (Item 8, Appendix F)
Tool Kit, General Mechanic (Item 9, Appendix F)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |