|
|
DRAFT
TB 9-2320-364-13&P-1
AC LOW PRESSURE SWITCH REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Materials/Parts
Field Level Maintenance
Oil, PAG 46V (Item 3, Appendix E)
Tags, Identification (Item 10, Appendix E)
Equipment Condition
Tie, Cable (Item 13, Appendix E)
Batteries disconnected (TM 9-2320-364-20).
Preformed Packing (Item 16, Figure 4,
Electronic control box (ECB) right side panel
removed (TM 9-2320-364-20).
Personnel Required
Tools and Special Tools
One
Shop Equipment, Common No. 1 (Item 5,
References
Shop Equipment, Common No. 2 (Item 6,
TM 9-2320-364-20
Tool Kit, Electrical (Item 8, Appendix F)
Tool Kit, General Mechanic's (Item 9, Appendix F)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |