|
|
DRAFT
TB 9-2320-364-13&P-1
AC WIRING HARNESS REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Maintenance Level
Tools and Special Tools
Field Level Maintenance
Tool Kit, Electrical (Item 8, Appendix F)
Tool Kit, General Mechanic's (Item 9, Appendix F)
Equipment Condition
Materials/Parts
Batteries disconnected (TM 9-2320-364-20).
Heater compartment access panel removed
Tags, Identification (Item 10, Appendix E)
(TM 9-2320-364-20).
Tie, Cable (Item 13, Appendix E)
Electronic control box (ECB) covers removed
Lockwasher (Item 4, Figure 4, Appendix G)
(TM 9-2320-364-20).
Locknut (Item 8, Figure 3, Appendix G)
Electronic control box (ECB) right side panel
Locknut (Item 14, Figure 4, Appendix G)
removed (TM 9-2320-364-20).
Personnel Required
Right side noise panel removed
One
(TM 9-2320-364-20).
Left side noise panel and rubber flap removed
References
TM 9-2320-364-20
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |