Click here to make tpub.com your Home Page

Page Title: Lifting Ring
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-4110-262-13&P
0005 00
WARNING
When stacking one ADR-300 on top of another, ensure
that both units are aligned so that the front and side walls
of the top unit are flush with the front and side walls of the
lower unit. This will ensure that the lower unit will support
the weight of the top unit. Failure to comply may result in
serious injury or death to personnel.
CAUTION
Ensure that the sling lines create an angle of MORE THAN 45 with the
container roof to prevent structural damage to the ADR-300. Failure to
comply may result in damage to the equipment.
For storage, ADR-300 containers may be stacked NO MORE THAN TWO HIGH. Hoisting requires a
hoist of 10,000-pound (4,536 kg) capacity and slings connected to the lifting rings in the upper corners of
the container as shown in the following figure.
Lifting Ring
0005 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business