|
|
TM 10-4110-262-13&P
0010 00
Table 1. Preventative Checks and Services - Continued.
Item
Intervals
Item to be
Procedures
Equipment not
No.
checked or
ready/available if:
Serviced
9
During/
IC
Check the entire container for
Damaged container panels,
After
damage. Check the door fit and
loose missing or damaged
seal. Check door hinges and
components, binding or
handles for lubrication (see table).
restricted movement of
Check for loose or missing
moving parts.
hardware.
10
After
IC /
Wash the system as described in
Refrigerator
Work Package 0014 00.
LUBRICATION REQUIREMENTS
ADR-300 lubrication requirements are summarized below:
Table 2. ADR-300 Lubrication Requirements.
Component
Lubricant
Door Hinges
Light Oil lubricant
Weekly (or as
required)
Door Lock
Light Oil lubricant
Weekly (or as
required)
Roof Access Steps
Light Oil lubricant
Weekly (or as
required)
END OF WORK PACKAGE
0010 00-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |