Click here to make tpub.com your Home Page

Page Title: SERVICE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-4110-262-13&P
0014 00
NOTE
The shelter base may be raised slightly (1-2-in.) to encourage drainage.
7. Ensure that the door to the RU controller enclosure is closed, the power input connectors are covered
and the electrical enclosure cover is securely in place.
8. Using a low-pressure water spray, wash down the container exterior from top to bottom. Do not use
abrasive tools or cleaners on the container or RU exterior.
9. Restrain the container door in the open position and allow all surfaces to dry completely.
END OF WORK PACKAGE
0014 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business