Click here to make tpub.com your Home Page

Page Title: INSTALL (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-4110-262-13&P
0023 00
WARNING
Keep fingers away from forklift tines while removing the
RU. Fingers could get pinched between the RU and the
forklift tines. Failure to comply may result in serious injury
to personnel.
6. Using a spotter inside and outside of the IC, direct the forklift driver to slowly insert the evaporator
section into the opening. The inside spotter shall guide the evaporator section through the opening in
the container and align the bolt holes in the back plate with the threaded inserts in the IC wall.
7. Align the condensate drain tube fitting on the IC rear wall with the corresponding hole in the RU back
plate.
8. Install eight mounting bolts through the bolt holes snugly, then tighten after all bolts are installed.
NOTE
The top four bolts are shorter than the lower mounting bolts.
9. Reconnect the external condensate drain tubes.
CAUTION
Do not over-tighten the RU mounting bolts. Over-tightening these bolts
may debond the threaded inserts from the IC structure causing container
leaks and reducing the security of the RU mounting.
NOTE
If a threaded insert is stripped replace it.
10. Connect the IC power supply cord to the IC power entry connector.
11. Reconnect the condensate hoses from the evaporator to the nipples on the drain pan.
12. Connect the RU power supply cord to an appropriate source of power. Turn on the power at the
source.
13. Operate the RU as described in Work Package 0005 00.
0023 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business