| |
TM 10-4130-239-14
5-15. HIGH PRESSURE SWITCH REPLACEMENT (CONT)
3. Cut three tie wraps attaching refrigerant line to wiring harness.
WARNING
To prevent electric shock, make sure power is disconnected from 12
VOLT INPUT FOR STARTING connection before performing this
procedure.
4. Tag three wires from switch. Remove two screws and three wires.
5. Remove three bracket mounting screws and three flatwashers.
6. Remove mounting bracket from switch.
7. Remove high pressure switch and refrigerant line.
1. Install high pressure switch and refrigerant line in mounting bracket.
2. Install mounting bracket, three mounting screws, and three flatwashers.
Change 2 5-31
|