| |
TM 10-4130-239-14
5-15.
HIGH PRESSURE SWITCH REPLACEMENT (CONT)
3.
Connect three wires to switch.
Install two screws.
Remove tags.
4.
Tie wrap refrigerant line to wire harness.
5.
Attach refrigerant line fitting to tee fitting.
6.
Install tie wrap around refrigerant line and discharge hose.
7.
Replace filter-drier before evacuating system (para 5-24).
8.
Leak-test system (para 5-6).
9.
Evacuate system (para 5-7).
10. Charge system (para 5-8).
5-32
|